Evo 2 hardware requirements: GPUs for the 7B and 40B DNA models, the NIM and fine-tuning
Eurokommerz, Vienna, since 2006: Private AI/ML · IT Managed Services · Enterprise Training · AI Hardware & Software
- NVIDIA's Evo 2 NIM 2.2.0, the latest release, lists the 40B model on two H100 80GB HBM3 or one H200 with 141 GB, and the 7B model on one H100, H200, RTX 6000 Ada Generation or L40S, both with a 1M context
- The NIM needs an NVIDIA driver from 550.90.07, Docker 23.0.1 or later, the NVIDIA Container Toolkit 1.13.5 or later and an x86_64 host, with 110 GB of disk for the 40B and 50 GB for the 7B
- NVIDIA's table does not list the H200 NVL, the RTX PRO 6000, the B200 or the B300; NVIDIA says the NIM runs on "any NVIDIA GPU that meets" its minimums, so these cards need a test before they carry a project
- Arc Institute's own code runs the 40B, 20B and 1B models only with FP8 through Transformer Engine on a Hopper GPU, while the 7B runs in bfloat16 on any supported GPU; Arc names no Blackwell GPU
- You can order the H200 NVL server alone, the setup of Evo 2 alone, or both together: the server delivered with everything installed and configured
Supplied by Eurokommerz: NVIDIA H200 NVL Request a price →
Evo 2 hardware requirements in NVIDIA's NIM
Evo 2 is Arc Institute's language model for DNA sequences, and NVIDIA packages its 7B and 40B versions as a NIM microservice with a context of up to 1 million. The Evo 2 NIM 2.2.0, read on 27 November 2026, lists the 40B model on two NVIDIA H100 80GB HBM3 or one NVIDIA H200 with 141 GB, and the 7B on one H100, H200, RTX 6000 Ada Generation or L40S, with an NVIDIA driver from 550.90.07. Arc Institute's own code needs FP8 through Transformer Engine on a Hopper GPU for the 40B model.
The model suits genomics and synthetic-biology teams that want to keep their sequence data on their own servers. Secondary analysis of sequencing runs, alignment and variant calling, is a different workload on different software, covered in our guide to a GPU server for genomics with Parabricks. This article stays with Evo 2: the GPUs NVIDIA lists, the ones it leaves out, the software around the NIM, context, fine-tuning and licence.
We supply the H200 NVL, a Hopper card with 141 GB of HBM3e, as cards and in servers with two to eight cards, and HGX H200 servers per project; send us the model size, your sequence lengths and the number of jobs a day and we reply with a configuration.
The GPUs NVIDIA lists for the Evo 2 NIM
NVIDIA's prerequisites page begins its table with the sentence "Run your Evo 2 NIM on any NVIDIA GPU that meets following minimum hardware requirements". The table is identical in release 2.1.0 and in 2.2.0.
| MODEL | GPU | GPU MEMORY | GPUS | DISK |
|---|---|---|---|---|
| Evo 2 40B (default) | NVIDIA H100 80GB HBM3 | 80 GB | 2 | 110 GB |
| Evo 2 40B (default) | NVIDIA H200 | 141 GB | 1 | 110 GB |
| Evo 2 7B | NVIDIA H100 80GB HBM3 | 80 GB | 1 | 50 GB |
| Evo 2 7B | NVIDIA H200 | 141 GB | 1 | 50 GB |
| Evo 2 7B | NVIDIA RTX 6000 Ada Generation | 48 GB | 1 | 50 GB |
| Evo 2 7B | NVIDIA L40S | 48 GB | 1 | 50 GB |
NVIDIA Evo 2 NIM prerequisites, release 2.2.0 ("latest and default", no date on the page) and release 2.1.0, read 27 November 2026. Every row lists precision "Mixed" and 16 GB of CPU RAM; the disk figure covers the container and the model.
"Mixed" means layers "with FP32, BF16, and FP8 floating-point precision tensors". Both models are listed with a context of 1 million. The CPU must be x86_64 (amd64); no ARM host is listed.
The release notes trace how the NIM got here. Release 1.0.0 of 18 February 2025 introduced the "40 billion parameters model trained on 11 trillion DNA nucleotides" with up to 1 million nucleotides. Release 1.0.2 of 28 May 2025 fixed an FP8 extra-states problem on "specific combinations of GPU interconnects and CPUs". Release 2.0.0 of 28 August 2025 added "support for loading custom and fine-tuned checkpoints", and 2.1.0 of 25 September 2025 "introduces support for the Evo 2 7B 1M model variant", with the 40B 1M model as the default. Release 2.2.0 of 16 September 2026 is "a stability release" that "addresses security vulnerabilities, includes bug fixes, and improves runtime reliability"; "The 7B and 40B model variants and APIs are unchanged from 2.1.0."
The GPUs the table does not list
The H200 NVL, the RTX PRO 6000 in any edition, the B200, the B300 and the GB200 are not in NVIDIA's minimum-hardware table for release 2.2.0. NVIDIA's own sentence speaks of any GPU that meets the minimums, and the H200 NVL has the same 141 GB as the listed H200. By our reading it meets the memory line of the 40B model, but NVIDIA lists no H200 NVL row, so it is not validated for this NIM. The same holds for the 96 GB RTX PRO 6000 Server Edition against the 48 GB line of the 7B model.
For the 40B model the precision matters as much as the memory. The NIM runs it in mixed precision with FP8 among its tensors, and Arc Institute states that its 40B, 20B and 1B models "require FP8 via Transformer Engine for numerical accuracy and a Nvidia Hopper GPU". The H200 NVL is a Hopper card with FP8. The B200 and B300 support FP8 as well, but neither Arc's README nor the NVIDIA Evo 2 pages we read name a Blackwell GPU, so whether the 40B gives the same numerical results there is not documented.
NVIDIA's BioNeMo documentation for Evo 2, which carries the banner "You are viewing an outdated version of the BioNeMo Documentation", lists the NIM's test hardware as "H200 (1 and 2 GPU configurations, 144 GB each)" and "H100 (2 GPU configuration, 80 GB each)", and names "NVIDIA Hopper" as the supported microarchitecture. Its 144 GB differs from the 141 GB in the NIM table; we use the NIM table.
Our guide to NVIDIA NIM requirements covers drivers, the container toolkit and licensing for NIM in general. Before an H200 NVL or RTX PRO 6000 carries a project, pull the Evo 2 NIM on the target card and compare the output for a reference sequence with a result from a listed GPU.
What the NIM needs from the host
| COMPONENT | MINIMUM | NOTE |
|---|---|---|
| NVIDIA driver | 550.90.07 | minimum CUDA not stated |
| Docker | 23.0.1 | Linux distribution supported by Docker |
| NVIDIA Container Toolkit | 1.13.5 | |
| CPU and RAM | x86_64, 16 GB | per model row |
| Disk | 110 GB (40B), 50 GB (7B) | container and model |
| Registry access | nvcr.io, NGC account, API key | to pull the container |
NVIDIA Evo 2 NIM prerequisites, release 2.2.0, read 27 November 2026.
The sample nvidia-smi output on the page shows CUDA 12.8, but NVIDIA states no minimum CUDA version. The 16 GB of host RAM is the NIM's minimum; a server that also prepares sequence data, runs Parabricks or serves other models needs far more, so the host memory is sized for the whole set of workloads.
On request we pre-install the operating system, drivers, CUDA and a container runtime, with remote setup by our engineering partner Vixen.UNO; pulling the NIM afterwards needs your NGC account and key.
Arc Institute's code instead of the NIM
Teams that run Evo 2 from Arc Institute's GitHub repository have their own requirements to meet: "Linux (official) or WSL2 (limited support)", CUDA 12.1 or newer, cuDNN 9.3 or newer, GCC 9 or Clang 10 or newer, Python 3.11 or 3.12, with PyTorch 2.6.x or 2.7.x recommended. The 7B models "can run in bfloat16 without Transformer Engine on any supported GPU". For the 40B, Arc writes that "The 40B model requires multiple H100 GPUs", and its Vortex inference code splits the model across the CUDA devices of the server.
| CHECKPOINT | CONTEXT | PRECISION, ARC CODE |
|---|---|---|
| evo2_40b | 1M | FP8 via Transformer Engine, Hopper |
| evo2_20b | 1M | FP8 via Transformer Engine, Hopper |
| evo2_7b | 1M | bfloat16, any supported GPU |
| evo2_7b_262k | 262K | bfloat16, any supported GPU |
| evo2_40b_base | 8K | FP8 via Transformer Engine, Hopper |
| evo2_7b_base | 8K | bfloat16, any supported GPU |
| evo2_1b_base | 8K | FP8 via Transformer Engine, Hopper |
Arc Institute's Evo 2 README on GitHub, read 27 November 2026.
An RTX PRO 6000 Server Edition meets the 7B condition by our reading, with 96 GB per card. Its Blackwell chip has compute capability 12.0, which CUDA added in release 12.8, so the CUDA and PyTorch builds on the server must support it; Arc names no Blackwell GPU. For the 40B model the H200 NVL is the card among those we supply that matches Arc's Hopper condition.
Context length and throughput
The NIM table lists a 1M context for both models, which the release notes count in nucleotides, and the 40B model card on Hugging Face describes it as "trained up to 1 million sequence length" over 50 layers. No document we read gives the GPU memory per context length, so a table of context against memory cannot be built from published figures, and the cache arithmetic of our guide to VRAM for 128K to 1M context cannot be applied to Evo 2 from the documents we read.
NVIDIA's BioNeMo pages give relative throughput without naming the hardware: "the 7B variant processes approximately 4.9x more tokens per step than the 40B variant", and moving from 8K to 1M context means 9.7x fewer tokens per step for the 7B and 8.9x fewer for the 40B. Scaling is described as "linear with a very small overhead on a cluster with fast interconnects". By our reading, jobs that need neither the 40B nor the long context get several times more tokens per step from the 7B at a short context, and the 40B at 1M is kept for the questions that need it. Measure your own jobs before you size for them.
Fine-tuning Evo 2 with BioNeMo
Arc names two routes for fine-tuning, its Savanna framework and NVIDIA BioNeMo, which has an Evo 2 tutorial. A fine-tuned checkpoint can then be served by the NIM, which loads "custom and fine-tuned checkpoints" since release 2.0.0. The BioNeMo pages list test configurations for BioNeMo Recipes of "A100 (1, 8, ..., 1024 GPU configurations)" and "H100 (1, 8, ..., 2048 GPU configurations)", plus A6000, A5880 and L40S, with Transformer Engine as the engine. None of the documents we read gives the GPU count or memory needed to fine-tune the 7B or 40B model.
For fine-tuning the 40B in FP8 we therefore plan on Hopper: an HGX H200 server, eight H200 SXM with 141 GB each joined through NVSwitch, which our guide to buying an HGX H200 server describes. Transformer Engine itself lists FP8 for Blackwell, as our guide to fine-tuning on HGX B200 quotes, but the Evo 2 documents name no Blackwell GPU, so a B200 for Evo 2 fine-tuning needs a trial first. For an HGX H200 order we need the end user's company, the installation site and the intended use, and the server maker and NVIDIA review the project before they confirm it, as our guide to the end-user certificate for NVIDIA GPUs explains.
Licence of the code, the weights and the NIM
Arc Institute publishes the Evo 2 code under "Apache-2.0", and the 40B model card on Hugging Face gives "License: apache-2.0". NVIDIA's BioNeMo model page states "This model is ready for commercial use.", says it is "governed by the NVIDIA Open Model License Agreement" and adds "ADDITIONAL INFORMATION: Apache 2.0 License." The terms therefore depend on where the weights come from.
Running the NIM in production is a separate question. Our NIM requirements guide quotes NVIDIA's NIM FAQ, which requires an NVIDIA AI Enterprise licence for production use, and each H200 NVL includes a five-year NVIDIA AI Enterprise subscription. This is general information as of November 2026, not legal advice; your legal department reads the licence texts for your use.
Which server for Evo 2 in-house
| JOB | LISTED BY NVIDIA/ARC | WHAT WE WOULD PLAN |
|---|---|---|
| 7B inference, NIM | one H100, H200, RTX 6000 Ada or L40S | a listed 48 GB card; H200 NVL after a test |
| 7B, Arc's code | bfloat16, any supported GPU | RTX PRO 6000 SE or H200 NVL |
| 40B inference, NIM | 1 × H200 or 2 × H100 | HGX H200; H200 NVL after a test |
| 40B, Arc's code | FP8, Hopper, multiple H100 | H200 NVL server, two to four cards |
| Fine-tuning | no GPU count published | HGX H200, per project |
NVIDIA Evo 2 NIM prerequisites 2.2.0 and Arc Institute's Evo 2 README, read 27 November 2026; the right-hand column is our planning reading, not a vendor validation.
Once a test on the card has passed, a plan we would start from is one server with two or four H200 NVL, the 7B for day-to-day work and a 40B instance for the long-context jobs. Our article on the protein binder design blueprint covers further BioNeMo workloads, and our guide for pharma and life sciences the structure-prediction NIMs that may run beside Evo 2. You can order the server alone, the setup of Evo 2 alone, or both together, the server delivered with everything installed and configured; write to us with the models, sequence lengths and data volumes and we suggest the configuration that fits your tasks and budget. For budgeting you can request our current NVIDIA price list.
FAQ
What are the Evo 2 hardware requirements?
Which GPU does Evo 2 40B need?
Does the Evo 2 NIM run on an H200 NVL?
How much GPU memory does Evo 2 need for 1M context?
Can Evo 2 be fine-tuned with BioNeMo?
What licence does Evo 2 use?
We supply H200 NVL servers for Evo 2 alone, set up the Evo 2 NIM or Arc's code alone, or deliver both together. Send us the model size, your sequence lengths and the jobs a day. We reply within one business day.
Request a priceWe reply within one business day