NVIDIA DGX B300 · SUPPLIED PER PROJECT

NVIDIA DGX B300,
supplied per project

NVIDIA’s 10U system with eight Blackwell Ultra GPUs and 2.1 TB of HBM3e. We supply it per project, and HGX B300 servers the same way, on one EU contract and invoice. Before we can quote, the distribution asks us for the company, the project and the intended use, and approvals take longer than an order for cards.

  • EU contract and invoice
  • Supplied per project
  • AI Enterprise licences on the same invoice
  • Manufacturer warranty
SUPPLIED PER PROJECT

DGX B300 specifications

Figures from NVIDIA’s DGX B300 product page (updated 15 October 2026), its datasheet (February 2026) and its user guide (updated 5 October 2026). We do not publish prices: the configuration, the support level, the licences and the approval of the project decide the quote.

SpecificationDGX B300What it means for your project
GPUs8 × Blackwell Ultra SXM, 288 GB HBM3e eachNVIDIA lists 2.1 TB per system; plan with about 270 GB per GPU
GPU memory2.1 TB HBM3e, 62 TB/sA 70B model in FP8, about 73 GB of weights, fits one GPU with close to 200 GB left for KV cache
NVLink2 × NVLink Switch System, 14.4 TB/s aggregateA model split across all eight GPUs stays inside one NVLink domain
FP4 Tensor Core144 PFLOPS sparse, 108 PFLOPS denseNVIDIA prints most Tensor Core figures with sparsity, so compare dense with dense across systems
CPUs, memory2 × Intel Xeon 6776P, 2 TB, up to 4 TBSet by NVIDIA; in HGX B300 servers the manufacturer defines CPU and memory
Networking8 × ConnectX-8 at up to 800 Gb/s; 2 × BlueField-3 at up to 400 Gb/sThe system ships without network cables or adapters, so switch ports, transceivers and fibre belong in the quote
System power15.1 kW (power supplies), 14.5 kW (busbar)datasheet rating; NVIDIA’s data-centre guide estimates peaks above it, 19.7 kW and 19 kW, so size feeds and cooling to the peak
Size, weight10U, 442 × 482.6 × 904.2 mm; 168 kg (power supplies), 123 kg (busbar)Check the rack depth, the floor rating and the route from the loading bay
Software, supportDGX OS 7 included; NVIDIA AI Enterprise recommended; three years of business-standard supportAI Enterprise is licensed per GPU: eight licences per system where it is used

Supplied per project: we check price and availability for your project once the distribution has the company, the project and the intended use.

Supplied per project
NVIDIA DGX B300
8 × Blackwell Ultra · 2.1 TB HBM3e · 10U
Check price and availability
On one EU contract and invoice. Before we quote, the distribution asks for the company, the project and the intended use. We reply within one business day.
HOW A PROJECT ORDER WORKS

How a DGX B300 project order works

The approval comes before the quote, for one system or for two. Approvals take longer than an order for cards.

01
Project data
You send the company, the project, the intended use and the site, with the number of systems and the support level.
02
Configuration
We work out the configuration: AC or busbar version, network ports and cabling, licences and services.
03
Approval by the distribution
We pass the project data to the distribution for approval, which is not certain until it is given.
04
Quote
You receive a written quote with its line items: system, power, network cabling, support, licences, installation and delivery terms.
05
Order
You place the order, with an end-use statement where the delivery route needs one.
06
Installation
NVIDIA requires installation by NVIDIA partner network personnel or NVIDIA field service engineers. Your data-centre staff or the colocation provider prepare the rack and the power.
07
Acceptance
Acceptance tests run on site before the system goes into production: serial numbers against the delivery note, diagnostics, sustained load and GPU-to-GPU bandwidth.

The quote lines, the export rules and the delivery are covered in our guide to buying a DGX B300 in the EU.

BEFORE WE CAN QUOTE

What we need from you

Company

Legal entity, registered address and VAT number. The distribution asks for it before a quote.

Project

Purpose, number of systems and project owner. The distribution asks for it before a quote.

Intended use

Training, fine-tuning or inference, the models and data, the sector. The distribution asks for it before a quote.

Site

Own data centre or colocation, country and rack position. The site decides the AC or busbar version, the power distribution and the delivery.

If the organisation that operates the system is not the buyer, or the system will leave the EU, name the end user and the destination as well: an export end-use statement covers both. Our guide to the end-user certificate for NVIDIA GPUs explains what such a statement contains and who signs it. Whether a delivery needs an export authorisation is a legal assessment for your company’s legal department.

BEFORE YOU ORDER

Before you order: the room

We check the rack, power and airflow before we quote. These are NVIDIA’s figures to hold against your room or your colocation contract.

Power and feeds

The AC version has twelve 3.2 kW power supplies in N+N redundancy at 200 to 240 V and twelve C19/C20 inlets, so one system takes twelve C19 outlets. NVIDIA’s data-centre guide estimates a peak of 19.7 kW per AC system and plans two systems per rack at 39.4 kW peak. The busbar version takes 54 V DC from power shelves that are not included with the system.

Power and cooling for a GPU rack →
Weight and delivery

The system weighs 168 kg with power supplies and 123 kg in the busbar version, takes 10U and is 904.2 mm deep. Packed, the AC system weighs 207.6 kg in a crate of 1,065 × 711 × 1,178 mm, so check the loading dock, the doors, the lifts and the floor rating on the way to the rack.

DGX B300 specs and site checklist →
Supply air and airflow

The user guide gives an inlet air range of 10 to 30 °C, and NVIDIA’s data-centre guide lowers the maximum above 1,000 ft (about 300 m). The guide asks for up to about 2,145 CFM of supply air per system at sea level and recommends active rear-door heat exchangers for dense racks; passive ones are not recommended for the DGX B300.

Liquid cooling for GPU racks →
THE OTHER ROUTE

DGX B300 or a PCIe server

A DGX B300 keeps eight GPUs and 2.1 TB of HBM3e in one NVLink domain, and as of October 2026 we found no NVIDIA B300 PCIe card. Where each model copy fits one 96 GB or 141 GB card, a PCIe server is the other route: we build AI servers to order with 2 to 8 H200 NVL or RTX PRO 6000 Server Edition cards, assembled and burn-in tested, with configuration and quote within one business day. Our comparisons DGX B300 or a server with eight RTX PRO 6000 and RTX PRO 6000 vs H200 NVL for LLM inference set them side by side.

AI servers, built to order →

ALSO PER PROJECT

HGX B300 servers and the DGX Station

HGX B300 servers

Server manufacturers build HGX B300 servers around NVIDIA’s eight-GPU baseboard, with their own processors, memory, cooling and support. We supply them per project, the same way as the DGX B300.

DGX B300 vs DGX B200 vs HGX B300 →
DGX Station GB300

We supply manufacturers’ versions of the DGX Station GB300 per project as well.

Buying a DGX Station GB300 in the EU →
FAQ

DGX B300, in short

Do you supply the NVIDIA DGX B300?
Yes, per project, on one EU contract and invoice with manufacturer warranty. Before we can quote, the distribution asks us for the company, the project and the intended use, and approvals take longer than an order for cards. We supply HGX B300 servers the same way.
What is the DGX B300 price?
There is no list price, because the quote depends on the AC or busbar version, the network cabling, the support level beyond the three years of Business Standard support, the AI Enterprise licences, the services and the approval of the project. The price is quoted per project once the configuration is fixed.
How is DGX B300 availability checked?
Per project. Once the distribution has the company, the project and the intended use, we check price and availability for your project. Approvals take longer than an order for cards, and an approval is not certain until it is given.
What do you need from us for a DGX B300 quote?
The company details, the project and the intended use, which the distribution asks for before a quote. The site, the number of systems, the network design and the support level complete the configuration. If the system will leave the EU, the destination and the end user belong in the enquiry as well.
Who installs a DGX B300?
NVIDIA’s user guide states that the system must be installed by NVIDIA partner network personnel or NVIDIA field service engineers. Your data-centre staff or the colocation provider prepare the rack and the power, and acceptance tests run on site before the system goes into production.
How much power does a DGX B300 need?
NVIDIA’s datasheet of February 2026 lists 15.1 kW for the version with power supplies and 14.5 kW for the 54 V busbar version. NVIDIA’s data-centre guide estimates peaks of 19.7 kW and 19 kW at 25 °C supply air, and plans two AC systems per rack at 39.4 kW peak.

Check price and availability for your project

We reply within one business day

By sending this form you agree that we process your details to answer your enquiry; see our privacy policy.

request@eurokommerz.at
Jordangasse 7, 1010 Vienna