BLOG · GUIDE · · UPDATED

AI server cost: what drives the price of a GPU server and what it costs to run

Eurokommerz, Vienna, since 2006: Private AI/ML · IT Managed Services · Enterprise Training · AI Hardware & Software

IN BRIEF
  • The price of an AI server is set by the GPU type and count, and memory, processors, power supplies, chassis and cooling follow from them
  • NVIDIA's guide for NVIDIA-Certified Systems asks for system memory of at least twice the GPU memory and six CPU cores per GPU, so the whole server grows with the card count
  • The warranty level, NVIDIA AI Enterprise licences per GPU and, for HGX B200 and HGX B300 servers, the project review by the server maker and NVIDIA are lines of their own
  • Running cost is driven by power and cooling: eight 600 W cards use at most about 210,000 kWh of board energy in five years, and every watt becomes heat
  • We publish no prices; the written quote sets out your configuration line by line, with the warranty terms

Supplied by Eurokommerz: AI servers, built to order  Request a configuration →

What an AI server costs, and why

What an AI server costs depends first on its GPUs: which type, how many and with how much memory. The memory, processors, storage, network, power supplies, chassis and cooling follow from them, and the warranty level, software licences and, for HGX systems, a project review come on top. In operation the main costs are power and cooling, and both grow with the power the cards draw.

This page contains no prices, no price ranges and no list prices. It sets out which decision creates which block of cost, so that two quotes become comparable and a budget rests on a configuration with reasons behind it. We build AI servers to order with two to eight GPUs and supply HGX B200 and HGX B300 servers per project; describe your models, users and site, and you receive a configuration with a written quote that lists every line separately.

COST FACTORWHAT DRIVES ITIN THE QUOTE
GPUstype, edition, count, memoryGPU line with the full product name
System memoryGPU memory times two, module sizemodules with count and size
Processorscores per GPU, socketsmodel and count
Storagemodels, data, index, mirrordrives with capacity
Networkcluster, storage, userscards, ports, cables, transceivers
Power supplies and chassiscard count, redundancy, coolingsupplies, chassis, cords
Warranty and serviceterm, response time, partsthe maker's warranty line
Software licencesGPUs running NVIDIA AI Enterpriselicence line with its term
Project reviewHGX B200 and HGX B300 serversdetails before the quote

our structure; memory and core minimums from NVIDIA's configuration guide for NVIDIA-Certified Systems (30 September 2026), licences from NVIDIA's AI Enterprise licensing guide (2 September 2026), as cited in our guide to comparing GPU server quotes.

GPU type and count set the class of the server

The first decision is the form of the GPU. PCIe cards such as the NVIDIA RTX PRO 6000 Blackwell Server Edition with 96 GB or the H200 NVL with 141 GB of HBM3e sit in the server one by one, and the card count can be chosen in steps; NVIDIA's configuration guide for NVIDIA-Certified Systems calls two, four or eight GPUs per server a balanced configuration. In HGX servers the GPUs are SXM modules on an NVIDIA board, and NVIDIA's HGX page lists both HGX B200 and HGX B300 with eight GPUs. An HGX B200 server therefore always has eight B200 with 180 GB each, 1.4 TB of HBM3e as NVIDIA prints it, and an HGX B300 server eight B300 with 2.1 TB.

Within one form, the edition and the memory make the difference. A quote line reading "RTX PRO 6000 96 GB" does not say whether it means the Server Edition, passively cooled at up to 600 W, or the Max-Q Workstation Edition at 300 W with its own fan. The H200 NVL brings NVLink bridges as separate parts, for two or four cards. Which lines a quote should carry for the cards is set out in our guide to comparing GPU server quotes.

The card count acts on every other factor. Our three reference configurations on the AI servers page show it: two RTX PRO 6000 Server Edition with 384 GB of DDR5, four with 768 GB, eight H200 NVL with 2.3 TB, eight NVMe drives and 400G networking. A server that will grow is ordered with the chassis, supplies and memory for the final count, as our guide to planning a GPU server for growth shows.

System memory and processors follow the GPUs

NVIDIA's configuration guide for NVIDIA-Certified Systems asks for system memory of at least twice the total GPU memory, at least six physical cores per GPU, two processor sockets and a PCIe Gen5 x16 link for each GPU. Part of the configuration is therefore fixed as soon as the GPUs are chosen.

GPUSGPU MEMORYMIN. SYSTEM MEMORYMIN. CORES
2 × RTX PRO 6000 SE192 GB384 GB12
4 × RTX PRO 6000 SE384 GB768 GB24
8 × H200 NVL1,128 GB2,256 GB48
8 × B200 (HGX B200)1,440 GB2,880 GB48

minimums from NVIDIA's configuration guide for NVIDIA-Certified Systems (30 September 2026), applied to the card count by our arithmetic; GPU memory from NVIDIA's product pages and HGX page, for HGX B200 as 8 × 180 GB.

Two servers with the same memory total can be populated differently. Module size and module count decide whether every memory channel is filled and at which speed the memory runs. For its HGX B200 server SYS-822GS-NBRT with 32 DIMM slots, Supermicro gives up to 4 TB of DDR5-6400 with one module per channel and up to 8 TB with two modules per channel, then at 5200 MT/s. What DDR5 currently does to a server quote is in our article on DDR5 in server quotes, and how much memory each workload needs in how much RAM a GPU server needs.

The server maker sets the processor platform. Supermicro's SYS-822GS-NBRT takes two Intel Xeon 6700 or 6500 series processors of up to 350 W, and Supermicro's AS-A126GS-TNBR, on the same HGX B200 board, two AMD EPYC 9005 or 9004 processors of up to 500 W. Model and core count belong in the quote as a line of their own.

Storage and network

Storage follows the use: drives for the operating system mirror, for model weights, for training data or a vector index. The quote lists each drive with its count, capacity and class, not a total. Supermicro's SYS-822GS-NBRT has eight front E1.S NVMe bays and two M.2 slots; our training node has eight NVMe drives.

The network differs between HGX generations. Supermicro's product page for the SYS-822GS-NBRT lists no ConnectX ports, and its brochure "NVIDIA Blackwell Solutions" (December 2025) names eight ConnectX-7 or BlueField-3 SuperNICs at up to 400 Gb/s and two dual-port BlueField-3 DPUs as cards for this B200 server. On HGX B300, NVIDIA's reference architecture places eight ConnectX-8 SuperNICs at up to 800 Gb/s on the board. Each port needs a cable or transceiver to its switch; a server that joins no cluster needs fewer and slower ports.

Power supplies, chassis and cooling

The power supplies follow the power of the cards and the redundancy you require. For HGX B200 servers the makers take different routes: Supermicro fits six 6,600 W Titanium supplies in 3+3 to the SYS-822GS-NBRT, Gigabyte twelve 3,000 W supplies in 6+6 to the G894-SD1-AAX5, and ASUS six 3,000 W supplies in 5+1 to the ESC NB8-E11. For its air-cooled 8U servers, Gigabyte states that the C19 cords are not included, so they are a line of their own.

The type of cooling changes the scope of the purchase. Air-cooled HGX B200 servers are 8U or 10U high. For its liquid-cooled 4U server SYS-422GS-NBRT-LCC, Supermicro writes "complete rack and onsite service are required", and the integration into a complete liquid-cooled rack is a condition of purchase. A server purchase then becomes a rack project.

Warranty level and service

Warranty and service come from the server maker, at the level configured in the quote, handled through us. The levels differ in term, response time and parts: Supermicro's Limited Warranty page, as cited in our article on the Supermicro SYS-822GS-NB3RT, lists three years of labour, one year of parts and one year of advance cross-ship for GPU systems. A server planned for five years needs an extension as a line of its own. Hardware service on site comes from the server maker, where it is configured in the quote.

Software licences

NVIDIA's licensing guide (updated 2 September 2026) states that NVIDIA AI Enterprise is licensed per GPU. The licence is needed where the server runs NVIDIA AI Enterprise software, such as NIM in production, compute vGPU profiles or NVIDIA support; an open-source engine such as vLLM on bare metal needs none. By the same guide, the H200 NVL includes a five-year subscription per card, while the RTX PRO 6000 Server Edition includes none. Graphics vGPU is counted differently: NVIDIA's vGPU packaging and licensing guide lists vApps, vPC and RTX vWS on a per concurrent user model. How the count works in detail is explained in our article on how NVIDIA AI Enterprise is licensed.

Setting up the software is a service of its own. On request we pre-install the operating system, drivers, CUDA and a container runtime, with remote setup by our engineering partner Vixen.UNO.

Project review for HGX B200 and HGX B300 servers

For an HGX B200 or HGX B300 server we need the end user's company, the installation site and the intended use before we quote. The server maker and NVIDIA review the project before they confirm it. What such a declaration contains is described in our guide to the end-user certificate for NVIDIA GPUs. Ordering an HGX B200 server is described in our sibling guide to buying an HGX B200 server, and whether single B200 or B300 GPUs can be ordered in our article on buying a single B200 or B300 GPU.

Running cost: power and cooling

In operation, power is the main cost, and it can be bounded before the purchase. Five years are about 43,800 hours. Eight 600 W cards draw at most 4.8 kW, so in five years they use at most about 210,000 kWh of board energy, before processors, fans, power-supply losses and cooling. With eight B200 at up to 1,000 W per GPU, by NVIDIA's carbon footprint summary for the HGX B200, the GPUs alone come to 8 kW.

SERVERAT THE WALLKWH PER YEAR
2 × RTX PRO 6000 SEabout 1.8 kWabout 15,800
4 × RTX PRO 6000 SEabout 3.4 kWabout 29,800
4 × RTX PRO 6000 SE, 450 Wabout 2.7 kWabout 23,700
8 × RTX PRO 6000 SEabout 6.3 kWabout 55,200

our estimates of power at the wall as on our server pages (cards at 600 W, two AMD EPYC 9135, 9355 or 9555 and 15 per cent for the rest), times 8,760 hours at constant full load; a measurement on the delivered system confirms or corrects them.

The table assumes constant full load. A server that waits for requests draws less; the measured kWh times your own tariff give the power cost. The power limit of the cards is a lever: NVIDIA's product brief SP-12355-001 gives the RTX PRO 6000 Server Edition a power limit configurable from 300 W, and four cards at 450 W stay on a 230 V 16 A feed, which we plan at 2.94 kW, by our estimate.

Every watt becomes heat that the room must remove. Our guide to GPU rack power and cooling works with 160 CFM of air per kW at an 11 °C rise. The feed is a cost of the site as well: we plan 5.89 kW on 230 V at 32 A, so a server with eight cards needs a three-phase feed, as our article on GPU server power on 16 A, 32 A and three-phase shows. In colocation, this load is part of the data-centre contract.

How to get a comparable quote

A comparable quote comes from a request that describes the use and from a quote that names every line separately. A few details are enough for the request:

  1. the task and the models to run, or the card count if it is fixed;
  2. the number of users and how many work at the same time;
  3. the site: rack, feeds, supply-air temperature;
  4. the planned service life, so that warranty and licences match it;
  5. for HGX servers, the end user, the installation site and the intended use.

Each point is explained in our article on the facts for a private AI sizing request. For cards and licences, companies can request our current NVIDIA price list; the prices themselves are not on the website. How NVIDIA itself handles prices is in our article on the NVIDIA GPU price list for Europe.

We size servers from models and users, and the sizing is free of charge; send us the five details, and we reply within one business day.

FAQ

How much does an AI server cost?
It depends on the configuration: GPU type and count, by NVIDIA's guide at least twice the GPU memory as system memory, processors, storage, network, power supplies, chassis, warranty level and licences. We publish no prices; the written quote sets out your configuration line by line, with the warranty terms.
What is the biggest cost factor in a GPU server?
The GPUs set the class of the server, because system memory, processor cores, power supplies, chassis and cooling follow from them. An HGX B200 server always has eight GPUs on one board, a PCIe server two, four or eight cards.
Why is there no price list for AI servers?
Because the server is fixed only with its configuration: memory, processors, storage, network and power are sized to the models and users. For cards and licences, companies can request our current NVIDIA price list; a server is quoted in writing.
How much power does an AI server use per year?
A server with four RTX PRO 6000 Server Edition draws about 3.4 kW by our estimate, about 29,800 kWh a year at constant full load. The measured kWh times your tariff give the power cost; at idle the draw is lower, and cooling comes on top.
Is the NVIDIA AI Enterprise licence included in the price of an AI server?
For the H200 NVL, yes: each card includes a five-year subscription. For the RTX PRO 6000 Server Edition and HGX servers, NVIDIA AI Enterprise is licensed per GPU wherever the software is used. An open-source engine on bare metal needs no licence.
Why does an HGX B200 server need a project review?
For HGX B200 and HGX B300 servers we need the end user's company, the installation site and the intended use; the server maker and NVIDIA review the project before they confirm it. The quote follows after that.

We build AI servers to order and supply HGX servers per project. Send us your models, users, site and planned service life, and you receive a configuration that lists every line and the warranty terms. We reply within one business day.

Request a configuration
Talk to an expert

We reply within one business day

We use your details only to answer your enquiry; see our privacy policy.

request@eurokommerz.at
Jordangasse 7, 1010 Vienna