Buying an HGX B200 server in Europe: models, order requirements and the quote
Eurokommerz, Vienna, since 2006: Private AI/ML · IT Managed Services · Enterprise Training · AI Hardware & Software
- An HGX B200 server carries eight NVIDIA B200 GPUs with 180 GB of HBM3e each on NVIDIA's HGX B200 board, 1.4 TB per system as NVIDIA prints it, linked by fifth-generation NVLink at 1.8 TB/s per GPU
- We supply HGX B200 servers per project from Supermicro, ASUS, Gigabyte, Dell, HPE and Lenovo, for example the Supermicro SYS-822GS-NBRT, the ASUS ESC NB8-E11 and the Gigabyte G894-SD1-AAX5
- For an order we need the end user's company, the installation site and the intended use; the server maker and NVIDIA review the project before they confirm it
- We publish no prices: the written quote follows from the model, processors, memory, drives, network adapters, warranty level, licences and the project review
- Your site prepares rack, power and network: NVIDIA rates the DGX B200 at 14.3 kW maximum, and Supermicro's SYS-822GS-NBRT is 950 mm deep and weighs 133 kg net
Supplied by Eurokommerz: HGX B200 servers Request a price →
What you buy with an HGX B200 server
An HGX B200 server is a rack server built by a server maker around NVIDIA's HGX B200 board: eight B200 GPUs with 180 GB of HBM3e each, 1.4 TB in total as NVIDIA's HGX platform page prints it (read 27 November 2026), and fifth-generation NVLink with 1.8 TB/s per GPU and 14.4 TB/s across the board. We supply these servers per project in Europe from Supermicro, ASUS, Gigabyte, HPE and Lenovo, with warranty and service from the server maker handled through us. There is no list price: the quote is written once the configuration is fixed and the project has been reviewed.
Our page on HGX B200 servers summarises what we supply. This guide covers the purchase itself: which models exist, what we need for an order, what the quote contains and what your data centre prepares. The component-by-component view of one configuration is in HGX B200 server specs and configuration, and feeds, cooling and floor in depth are in HGX B200 power and cooling in the data centre.
For an order we need three facts from you: the company of the end user, the site where the server will be installed and what it will be used for. The server maker and NVIDIA review the project before they confirm it, so these details belong in the first message. What such an end-use declaration contains is explained in our guide to the end-user certificate for NVIDIA GPUs. We supply the server as configured for your site; send us the end user, the site and the intended use and we reply with the questions on the configuration within one business day.
HGX B200 server, DGX B200 and what we supply
The DGX B200 is NVIDIA's own server on the same board. NVIDIA's DGX B200 user guide (updated 17 October 2026) lists eight B200 GPUs with 1,440 GB of GPU memory, two Intel Xeon Platinum 8570 processors, 2 TB of system memory and a maximum of 14.3 kW in a 10U chassis. An HGX B200 server from a maker carries the same eight GPUs and the same NVLink switches. The maker chooses the processors, memory, drives, power supplies and chassis, you choose the operating system, and warranty and service come from the server maker.
We do not supply DGX servers. If you specifically need a DGX system with NVIDIA support, it is sold through NVIDIA's certified DGX partners. The steps of a DGX or HGX B300 order are set out in our guide to buying a DGX B300 in the EU; this page keeps to the B200 generation.
HGX B200 server models from Supermicro, ASUS and Gigabyte
The makers publish their HGX B200 systems under their own model names, and each family has air-cooled and liquid-cooled versions. The table lists the models whose pages and datasheets we read on 27 November 2026.
| MAKER | MODEL | HEIGHT, COOLING | PROCESSORS |
|---|---|---|---|
| Supermicro | SYS-822GS-NBRT | 8U, air | 2 × Intel Xeon 6700/6500 with P-cores |
| Supermicro | AS-A126GS-TNBR | 10U, air | 2 × AMD EPYC 9005/9004 |
| Supermicro | SYS-422GS-NBRT-LCC | 4U, liquid | 2 × Intel Xeon 6700 with P-cores |
| ASUS | ESC NB8-E11 | 10U, air | 2 × 4th/5th Gen Intel Xeon Scalable |
| Gigabyte | G893-SD1-AAX5 | 8U, air | 2 × 5th/4th Gen Intel Xeon |
| Gigabyte | G894-SD1-AAX5 | 8U, air | 2 × Intel Xeon 6700/6500 series |
| Gigabyte | G894-AD1-AAX5 | 8U, air | 2 × Intel Xeon 6900 series |
| Gigabyte | G4L3-SD1-LAX5 | 4U, liquid | 2 × 5th/4th Gen Intel Xeon |
the makers' product pages and datasheets, read 27 November 2026: Supermicro product pages; ASUS datasheet ESC NB8-E11 (file of 29 May 2025); Gigabyte product pages.
Two details avoid a wrong order. Supermicro's model names differ by one character between generations: the SYS-822GS-NBRT carries HGX B200, the SYS-822GS-NB3RT HGX B300. And the ASUS ESC NB8-E11 is built on 4th and 5th Gen Xeon Scalable processors, an older platform than the Xeon 6 in the newer Supermicro and Gigabyte models; ASUS's glossary names it as its HGX B200 system, and we found no ASUS HGX B200 model with Xeon 6 or EPYC.
The liquid-cooled 4U models come with conditions. Supermicro describes the SYS-422GS-NBRT-LCC with "complete rack and onsite service are required". How the makers compare in detail is the subject of our comparison of HGX B200 and B300 servers from Supermicro, ASUS and Gigabyte.
What we need for an HGX B200 order
Before the server maker and NVIDIA review a project, the enquiry needs these facts. The more complete the first message, the fewer rounds of questions follow. A preferred maker is optional: without one, we propose models that suit your rack and your feeds.
| WHAT WE ASK | DETAILS | WHY |
|---|---|---|
| End user | legal entity and registered address of the company that runs the server | project review by maker and NVIDIA |
| Installation site | own data centre or colocation, country, rack position | project review, power, delivery |
| Intended use | training, fine-tuning or inference, models, sector | project review, configuration |
| Number of servers | one server, two, or a cluster | network, switches, power |
| Preferred maker | if your other servers come from one maker | management tools, service |
| Service level | the maker's warranty and on-site hardware service | quote lines |
our order requirements for HGX B200 and B300 servers, as on our HGX B300 page, 27 November 2026.
A confirmation is not certain until the server maker and NVIDIA give it. Delivery within the EU; other destinations on request, subject to export and sanctions rules. If the server will leave the EU, the destination and the end user belong in the enquiry as well, for the reasons given in our end-user certificate guide.
HGX B200 server price: what the quote is made of
We publish no prices for HGX B200 servers, and no figure can be given before the configuration is fixed, because two quotes for "an HGX B200 server" can describe different machines. The board with its eight GPUs is the same in every model; almost everything around it varies. These are the lines a quote from us lists.
| QUOTE LINE | WHAT DECIDES IT |
|---|---|
| Server model | maker, model, height, air or liquid cooling |
| Processors | series and core count, for example Xeon 6700 or EPYC 9005 |
| System memory | module size and count, one or two DIMMs per channel |
| Drives | boot drives and NVMe data drives, capacity |
| Network adapters | 400G NICs or SuperNICs per GPU, DPUs for storage |
| Cables, transceivers | per port, with lengths |
| Power supplies, cords | number of supplies, cord type for your PDUs |
| Warranty and service | the maker's term and on-site service level |
| NVIDIA AI Enterprise | licences per GPU, term, support level |
| Software preparation | operating system, drivers, CUDA, container runtime |
| Delivery terms | delivery address and conditions |
our quote structure for HGX B200 servers, 27 November 2026.
The network line needs attention on this generation. NVIDIA's DGX B200 user guide lists four OSFP ports for eight ConnectX-7 single-port cards, which are PCIe cards. Supermicro's brochure "NVIDIA Blackwell Solutions" (December 2025) gives the SYS-822GS-NBRT eight single-port ConnectX-7 or BlueField-3 SuperNICs at up to 400 Gb/s and two dual-port BlueField-3 DPUs, while its product page lists only the empty slots. A quote without these adapters is a different machine from one with them, so ask that each adapter is a named line. Our guide to comparing GPU server quotes line by line shows how to put two offers side by side.
NVIDIA AI Enterprise is licensed per GPU, as our article on how NVIDIA AI Enterprise is licensed sets out, so a server with eight GPUs needs eight licences where the software is used. The licences come on the same invoice as the hardware. For card prices and licences you can also request our current NVIDIA price list; servers on the HGX board are always quoted per project.
HGX B200 or HGX B300 for this order
The choice of generation decides the order before any line of the quote does. On NVIDIA's HGX page, read 27 November 2026, the HGX B300 has 2.1 TB of GPU memory against 1.4 TB, 108 against 72 PFLOPS of dense FP4 (144 PFLOPS sparse on both), while the HGX B200 keeps 296 TFLOPS of FP64 against 10 TFLOPS. NVIDIA's enterprise reference architecture adds that the HGX B300 baseboard carries eight ConnectX-8 SuperNICs at up to 800 Gb/s, where B200 servers use separate 400G cards. HGX B200 servers have a considerably shorter lead time than B300. Where the models fit in 1.4 TB and the network runs at 400 Gb/s per GPU, B200 is the generation to order; our article HGX B200 now or HGX B300 later works through the decision, and which LLMs run on eight B200 does the memory arithmetic per model.
What your site prepares before delivery
An HGX B200 server is a high-density system, and the room is checked before the order. Four points cover most of it; our power and cooling guide for the HGX B200 goes through each in detail.
- Power: NVIDIA rates the DGX B200 at 14.3 kW maximum and the makers publish no system figure for their models, so plan the feeds for that class with 200 to 240 V supplies; Supermicro's SYS-822GS-NBRT has six 6,600 W supplies as 3+3.
- Rack depth: the SYS-822GS-NBRT is 950 mm deep and the ASUS ESC NB8-E11 885 mm, against 897.1 mm for the DGX B200.
- Weight and delivery path: Supermicro gives 133 kg net and 155 kg gross for the SYS-822GS-NBRT; check loading dock, doors, lifts and floor rating on the way to the rack.
- Network: decide whether the server stands alone or joins others on a compute fabric, because switch ports, cables and transceivers follow from that.
Our site survey for GPU servers lists what to measure. If the rack is in a colocation facility, agree the delivery rules, access and the permitted power per rack with the provider before a delivery date is set; these figures are in the colocation contract, not in the server datasheet. Your data-centre staff or the colocation provider rack and connect the server; we do not work on site, and hardware service on site comes from the server maker as configured in the quote.
Software on delivery
The operating system is your choice, Ubuntu or RHEL for example, with NVIDIA's data-centre driver and CUDA. The B200 needs the R570 driver branch or newer and CUDA 12.8 or newer; the exact versions, also for MIG, are listed in our HGX B200 configuration article. On request we pre-install the operating system, drivers, CUDA and a container runtime, with remote setup by our engineering partner Vixen.UNO. After delivery, plan your own acceptance test: serial numbers against the delivery note, diagnostics, sustained load and GPU-to-GPU bandwidth, as our GPU server acceptance testing guide describes.
How an HGX B200 order runs with us
- You send the end user's company, the installation site, the intended use and the number of servers.
- We work out the configuration with the maker: model, processors, memory, drives, network adapters, power supplies, warranty level and licences.
- The server maker and NVIDIA review the project.
- You receive a written quote that sets out each line, the configuration and the warranty terms.
- You order and sign the end-use and sanctions declaration.
- The server is delivered to your site and racked by your staff or your colocation provider.
We supply HGX B200 servers per project with the maker's warranty handled through us; describe the models you plan to run and your rack position, and we answer with a configuration proposal and the next steps.
FAQ
Where can I buy an HGX B200 server in Europe?
How much does an HGX B200 server cost?
Which HGX B200 server models are there?
What is the difference between an HGX B200 server and a DGX B200?
How much GPU memory does an HGX B200 server have?
Does the HGX B200 have a shorter lead time than the HGX B300?
Do you install the HGX B200 server on site?
We supply HGX B200 servers from Supermicro, ASUS, Gigabyte, Dell, HPE and Lenovo per project. Send us the end user's company, the installation site and the intended use, and we answer with the configuration questions and the next steps. We reply within one business day.
Request a priceWe reply within one business day