BLOG · COMPARISON ·

Wait for Rubin or buy Blackwell: Vera Rubin vs Blackwell for one to eight GPUs

Eurokommerz, Vienna, since 2006: Private AI/ML · IT Managed Services · Enterprise Training · AI Hardware & Software

IN BRIEF
  • NVIDIA's results release of 17 November 2026 reports deliveries of Vera Rubin NVL72, a rack with 72 Rubin GPUs and 36 Vera CPUs.
  • For the eight-GPU HGX Rubin NVL8 and DGX Rubin NVL8, NVIDIA had given no date as of 28 November 2026.
  • NVIDIA prints 2 TB of HBM4 and 270 PFLOPS of dense NVFP4 for the eight GPUs of an HGX Vera Rubin NVL8, against 1.4 TB and 72 PFLOPS dense FP4 for HGX B200.
  • No NVIDIA document we read names a Rubin PCIe card; the RTX PRO Blackwell cards remain the PCIe line.

Supplied by Eurokommerz: HGX B200 servers  Request a price →

Should I wait for Rubin or buy Blackwell?

A company that needs one to eight GPUs in 2026 or 2027 can order Blackwell today and cannot yet plan a Rubin server. NVIDIA's results release of 17 November 2026 reports deliveries of the Vera Rubin NVL72 rack, while its HGX page gives no date for the eight-GPU HGX Rubin NVL8. Waiting makes sense only for a project without a start date that can also wait for power and software figures NVIDIA has not published.

This note collects what NVIDIA has said about Vera Rubin, with the date of each document, and sets the eight-GPU Rubin figures against the HGX B200. We make no forecast of our own on dates or prices. Where NVIDIA's documents disagree, both figures are given.

We supply HGX B200 servers and HGX B300 servers per project from Supermicro, ASUS, Gigabyte, HPE and Lenovo, with warranty and service from the server maker. Rubin NVL72 racks are outside what we supply. HGX Rubin NVL8 servers we will quote per project once Supermicro, ASUS or Gigabyte take orders. For an order we need the end user's company, the installation site and the intended use, and the server maker and NVIDIA review the project before they confirm it; our guide to the end-user certificate for NVIDIA GPUs explains that declaration. Send us your models and the date the system has to run, and we work out which Blackwell server covers them.

Rubin release date: what NVIDIA has said so far

NVIDIA has published its Rubin plans step by step since January 2026. The table lists the statements a buyer can check, in order.

DATENVIDIA DOCUMENTWHAT IT SAYS
5 January 2026press release on RubinHGX Rubin NVL8 announced; partner products in the second half of 2026
31 May 2026press release on productionproduction shipments "set to begin starting this fall"
26 August 2026Form 10-Q, quarter to 26 JulyVera Rubin began production shipments in Q3 FY2027
30 September 2026HGX platform pageHGX Rubin NVL8 and HGX Vera Rubin NVL8 listed, no date
17 November 2026Q3 FY2027 results releasedeliveries of Vera Rubin NVL72 have begun

NVIDIA press releases of 5 January 2026 and 31 May 2026, NVIDIA HGX platform page (page date 30 September 2026) and NVIDIA results release of 17 November 2026, all read 28 November 2026; Form 10-Q as cited in our article on the AI hardware budget for 2027.

The results release reports that NVIDIA ramped production of Vera Rubin NVL72 and began delivering it. It names no NVL8 system and no HGX board. The press release of 5 January 2026 describes HGX Rubin NVL8 as "a server board that links eight Rubin GPUs through NVLink" and mentions DGX Rubin NVL8 systems in the context of DGX SuperPOD. Neither the HGX page nor any later release we read puts a date on either. Our article on the AI hardware budget for 2027 quotes the Form 10-Q in full and adds that NVIDIA names Feynman as the architecture after Rubin, without a year.

The Vera Rubin NVL72 is a rack-scale system with 72 Rubin GPUs, 36 Vera CPUs and 20.7 TB of HBM4. It is a different purchase from an eight-GPU server, and we do not supply it.

Vera Rubin vs Blackwell in NVIDIA's figures

NVIDIA's HGX page prints the Blackwell and the Rubin boards in two separate tables. The Rubin values are printed in the HGX Vera Rubin NVL8 column, the version with one Vera CPU on the board. The HGX Rubin NVL8 column, the version for x86 servers, shows only its configuration and the note that "CPU and memory specs are defined by OEM offerings."

ROWHGX B200HGX VERA RUBIN NVL8NOTE
GPUs8 × Blackwell SXM8 × Rubin SXMVera version: one Vera CPU
GPU memory1.4 TB HBM3e2 TB HBM4about 1.4 times
FP4, dense72 PFLOPS270 PFLOPSRubin row: NVFP4 Training
FP8, dense36 PFLOPS130 PFLOPSabout 3.6 times
FP64296 TFLOPS265 TFLOPSRubin lower
NVLink5th gen, 1.8 TB/s per GPU6th gen, 3.6 TB/s per GPURubin GPU table
Networking0.8 TB/s1.8 TB/sRubin: bi-directional

NVIDIA HGX platform page (page date 30 September 2026, read 28 November 2026), per eight-GPU board. HGX B200 FP8 dense is half of the 72 PFLOPS printed sparse, per NVIDIA's footnote "Dense is ½ sparse spec shown"; ratios are our arithmetic.

The sparse figures follow the same pattern. NVIDIA prints 400 PFLOPS of sparse NVFP4 inference for the Vera Rubin NVL8 and 144 PFLOPS of sparse FP4 for the HGX B200. The label differs between the two tables, "NVFP4 Training" against "FP4 Tensor Core", so the ratio of 3.75 between 270 and 72 PFLOPS compares rows that NVIDIA names differently.

NVIDIA's headline claim for the board is "up to 10x more token factory throughput versus HGX B200". Its footnote calls this "Projected performance subject to change" and names the conditions: Kimi K2-Thinking, input and output of 4K tokens, "HGX Rubin NVL8 with Sparse NVFP4, HGX B200 with Dense NVFP4". A projection that compares sparse against dense arithmetic says little about a dense FP8 model in your own engine, so we do not size with it.

Two of NVIDIA's documents disagree on the single Rubin GPU. The HGX page gives 288 GB of HBM4 at 22 TB/s and 3.6 TB/s of NVLink per GPU. The Vera Rubin NVL72 page (page date 21 October 2026) gives 288 GB at 19.2 TB/s and 3 TB/s. The eight-GPU totals divided by eight are lower again: 130 TB/s comes to about 16 TB/s per GPU, and 2 TB to 250 GB. NVIDIA explains none of these differences, much as it prints 2.1 TB for eight B300 with 288 GB each.

What NVIDIA has not published for HGX Rubin NVL8

Three figures that decide a server purchase are missing from every NVIDIA page we read. There is no power figure per Rubin GPU or per board. NVIDIA does not name the cooling method of the NVL8 boards; its table gives an inlet temperature of 45 °C for the Vera Rubin NVL8, the same figure it prints for the NVL72 rack. And there is no date.

The server makers have announced their first HGX Rubin NVL8 servers. ASUS names the XR R1I12B in a 2U liquid-cooled and a 3U hybrid-cooled version for launch in Q4 2026 (press release of 21 October 2026); Supermicro lists the liquid-cooled 2U SYS-222GS-R2BT-ALC in its November 2026 brochure; Gigabyte names the 3U G3L4-SD5-LA08 in its release of 17 November 2026, without a date. Our article on liquid cooling for GPU racks describes the 45 °C inlet class and what it requires of a site.

The Blackwell server is fully documented by comparison. NVIDIA's HGX B200 carbon footprint summary rates each B200 "Configurable up to 1000 W". NVIDIA rates its own DGX B200 at 14.3 kW maximum. Supermicro, ASUS and Gigabyte publish air-cooled HGX B200 servers in 8U and 10U with their power supplies, as listed on our page on HGX B200 servers. A rack position can be planned against these numbers today, while a Rubin NVL8 plan has none to start from.

If your rack position has a fixed power budget or air cooling only, tell us the feed and the cooling at the site, and we check which HGX B200 or HGX B300 server fits it.

Software maturity: CUDA, drivers and engines

Blackwell support in CUDA is several releases old. NVIDIA's CUDA GPU list, published 16 October 2026, gives the B200 compute capability 10.0 and the B300 10.3; CUDA 12.8 added the B200 target, CUDA 12.9 the B300 target. vLLM 0.33.0 of 2 November 2026 builds its wheels and images for CUDA 13.0, which needs an R580 or newer driver.

Rubin support is recent. NVIDIA's CUDA 13.5.0 announcement of 4 November 2026 adds support for Vera Rubin and states that TCC "is not supported on Rubin and later GPUs", as our article on WDDM, TCC and MCDM explains. The same CUDA GPU list does not yet show a Rubin GPU; the only compute capability we found is in NVIDIA's CUDA-Q documentation, which refers to "compute capability 10.7 (Rubin)". DGX OS 8.1.0 of 22 September 2026 is a technical preview for the preproduction DGX Vera Rubin NVL72 only, "not intended for production use", as described in our article on DGX OS 8. TensorRT-LLM added a Rubin row to its quantisation matrix in the documentation of release candidate 1.4.0rc4 of 16 November 2026, while its stable release was still 1.2.1.

For an early Rubin system this means a CUDA 13.5 toolchain, a new driver branch and engine releases that have just added the GPU. A team whose validated stack runs on CUDA 12.8 or 12.9 would rebuild its containers for CUDA 13.5 first; on a B200 that stack runs as it is.

PCIe cards: RTX PRO Blackwell stays the PCIe line

A company that needs one to four GPUs usually looks at PCIe cards in a standard server, so the Rubin question often comes up here. None of the NVIDIA documents read for this article names a Rubin PCIe card: the HGX page lists SXM modules on eight-GPU boards, and the Vera Rubin NVL72 page lists the rack, a superchip and the GPU. NVIDIA's RTX PRO desktop line-up of 8 September 2026 lists the RTX PRO Blackwell range, and the documents read for our budget article announce no new RTX PRO generation for 2027.

For a PCIe server the Blackwell choice is therefore the NVIDIA RTX PRO 6000 Blackwell Server Edition, with 96 GB of GDDR7 per card, or the H200 NVL, a Hopper card with 141 GB. Our guide to the successor of the NVIDIA H200 explains that no Blackwell B-series PCIe card exists either. Waiting for Rubin is no reason to postpone a PCIe purchase, because none of these documents names a Rubin card to wait for.

When waiting for Rubin is reasonable

Waiting is a sound decision in a few cases.

  • The project has no start date and no workload is waiting for the hardware.
  • The site is being built for liquid cooling anyway, and the buyer can accept power figures that are still unpublished.
  • The workload is sparse NVFP4 inference at a scale where NVIDIA's projected tenfold throughput, if it holds for your model, would change the number of servers.
  • The plan is a rack-scale system such as the Vera Rubin NVL72, which is outside what we supply.

When waiting costs a year of use

A server ordered now runs from its delivery and handover. A server that waits for an NVL8 date runs from a date that NVIDIA has not given, followed by the same project review, configuration and quote as any other order. If that wait turns out to be a year, it is a year in which the models run on rented capacity or do not run.

Three cases make the wait expensive. First, models that already fit: by our planning rule an HGX B200 server holds about 1,183 GiB for weights and KV cache, enough for 512 concurrent sessions of 8,192 tokens with eight copies of Llama 3.3 70B in FP8, as worked through in our guide to HGX B200 now or HGX B300 later. Second, double precision: the Vera Rubin NVL8 is printed at 265 TFLOPS of FP64 against 296 TFLOPS for the HGX B200, and the Rubin HPC GPU NVIDIA announced on 16 November 2026 is "expected to be available in 2028", as our article on FP64 GPU servers records. Third, air-cooled rooms, which Blackwell servers are documented for and Rubin NVL8 is not.

Within Blackwell the choice between generations stays. The HGX B300 has 2.1 TB and 108 PFLOPS of dense FP4, the HGX B200 1.4 TB and 72 PFLOPS. HGX B200 has a considerably shorter lead time than B300. The makers' models are compared in HGX B200 and B300 servers from Supermicro, ASUS and Gigabyte.

How we quote a Blackwell server

We quote HGX B200 and HGX B300 servers per project, with the server maker, processors, memory, network cards and warranty level as separate lines, and we publish no prices. Companies that want an overview first can request our current NVIDIA price list. On request we pre-install the operating system, drivers, CUDA and a container runtime, with remote setup by our engineering partner Vixen.UNO; racking is done by your data-centre staff or colocation provider. Describe the workload and the date it has to run, and we answer with a configuration and the steps of the project review.

FAQ

Should I wait for Rubin or buy Blackwell?
Buy Blackwell when the project has a start date, the models fit 1.4 TB or 2.1 TB per server, or the room is air-cooled. Wait only when nothing depends on the date and the site can take power and cooling figures NVIDIA has not yet published for HGX Rubin NVL8.
What is the Vera Rubin release date?
NVIDIA's results release of 17 November 2026 reports deliveries of Vera Rubin NVL72 racks. For HGX Rubin NVL8 and DGX Rubin NVL8, NVIDIA had given no date as of 28 November 2026.
Vera Rubin vs Blackwell: how much faster is Rubin?
On NVIDIA's HGX page, eight Rubin GPUs reach 270 PFLOPS of dense NVFP4 and 130 PFLOPS of dense FP8, against 72 and 36 PFLOPS for HGX B200. FP64 is 265 against 296 TFLOPS. NVIDIA's tenfold throughput claim is a projection comparing sparse with dense NVFP4.
What is HGX Rubin NVL8?
An NVIDIA board with eight Rubin SXM GPUs on sixth-generation NVLink, for x86 servers; the HGX Vera Rubin NVL8 adds one Vera CPU. For the Vera Rubin version NVIDIA prints 2 TB of HBM4 for the eight GPUs; it gives no power figure for either.
Will there be a Rubin PCIe card?
None of the NVIDIA documents we read names one. The PCIe cards for servers remain the RTX PRO Blackwell line, such as the RTX PRO 6000 Blackwell Server Edition, and the H200 NVL.
Do you supply Rubin servers?
Rubin NVL72 racks are outside what we supply. HGX Rubin NVL8 servers we will quote per project once Supermicro, ASUS or Gigabyte take orders. Today we supply HGX B200, HGX B300 and HGX H200 servers per project from Supermicro, ASUS, Gigabyte, Dell, HPE and Lenovo, and PCIe servers with RTX PRO 6000 Server Edition or H200 NVL built to order.

We supply HGX B200 and HGX B300 servers per project and PCIe servers with RTX PRO Blackwell cards. Send us your models, the number of users and the date the system has to run. We reply within one business day.